Before the start of the summer season in Orion City preparatory work is being carried out.

During a detailed inspection of all the objects on the territory of the complex it suddenly became clear that our bridge over the pool is in disrepair and requires urgent repair or even complete replacement. All its components are almost completely rotted, as for 9 years it has never been repaired but only painted.

Since the complete replacement of the bridge was a long and expensive process it was repaired for the last time. At the expense of reserve funds the bridge beam was reinforced with steel constructions and the platform boards and balustrades were replaced. Now the bridge looks like a new one but in the future it will be necessary to plan the construction of a new bridge.